Expertise

Hyperbaric work without immersion

Compressed-air workers for tunnel boring machine excavation chambers, pressurised galleries and caissons: a team holding the CAH mention D, organised as rigorously as our diving work.

When a tunnel boring machine (TBM) digs beneath the water table or under a river, compressed air holds back the ground and the water. To inspect the cutterhead, change tools or repair the cutting head, operatives enter the chamber while it is kept under pressure: these are compressed-air workers, known in France as tubistes. The French Labour Code classes this hyperbaric work without immersion as mention D.

Our employees and operatives hold the French hyperbaric competence certificate (CAH) mention D. SIDON is targeting company certification for hyperbaric works, mention D, by the end of 2026, alongside its hyperbaric certification, mention A and its MASE-certified safety system.

A new activity for the company, not for the team: our operatives have many hyperbaric interventions to their credit. They apply the rules that already govern our diving work: a hyperbaric operations supervisor, a written procedure, a safety sheet and rescue resources defined before any pressurisation.

Our compressed-air workers operate on underground works: metro, rail and road tunnels, sewer mains, utility galleries, shafts and caissons. A typical intervention is described on the page hyperbaric interventions in TBM excavation chambers.

Services

What we do in compressed air

8 services in 2 families, from the TBM excavation chamber to the submerged dry chamber. Each intervention is prepared with the tunnelling contractor and the operator.

1In TBM excavation chambers

Excavation chamber interventions

Changing cutting tools

Disc cutters, scrapers, buckets and teeth replaced under pressure, after recording their wear.

Cutterhead inspection

Wear readings, measurements, photos and findings on the cutting head, under compressed air.

Welding and hardfacing

Hyperbaric welding and cutting: structural repairs and wear-resistant hardfacing, under a hot work permit.

Clearing and cleaning

Clogged clay, blocks and deposits removed from the cutterhead and the excavation chamber.

Chamber mechanics

Injection nozzles, sensors, screens and wear parts replaced according to the machine type.

2Galleries, shafts and caissons

Underground works

Pressurised galleries

Excavation or repair of a gallery under compressed air, without a TBM, in water-bearing ground.

Caisson sinking

Work in the working chamber of a caisson sunk under compressed air, below the water table.

Welding in a submerged dry chamber

Dry hyperbaric welding inside a chamber placed underwater, with our mention A commercial divers.

Conditions

What the chamber imposes

  • Support pressure set by the ground and the water table
  • Confined space, heat, humidity and noise in the chamber
  • Mud, bentonite or conditioned soil around the cutterhead
  • Co-activity with the TBM operating crew
  • Lock, gases and rescue checked before each compression
  • Decompression carried out according to the tables of the order of 22 April 2024

Mention D: what the French Labour Code says

Under the French Labour Code, a worker is in a hyperbaric environment as soon as they are exposed to a relative pressure above 100 hectopascals (articles R. 4461-1 et seq.). Article R. 4461-28 classes activities by mentions: A for work with immersion, B for interventions with immersion for other purposes, C for interventions without immersion in healthcare, D for hyperbaric work without immersion.

Like mention A, mention D is reserved for companies certified by an accredited body (article R. 4461-43). The order of 29 September 2017 sets the conditions for this certification and lists the works concerned in its annex. The order of 22 April 2024 sets the rules of execution: breathing gases, durations, decompression tables, team composition and rescue.

Work without immersion subject to certificationExamplesTargeted by SIDON
Tunnel excavation with a tunnel boring machineExcavation chamber interventions: cutting tools, inspection, welding, clearingYes
Excavation of a pressurised tunnel or gallery without a TBMGalleries, cross-passages and connections dug under compressed airYes
Sinking with submerged caissons filled with compressed airShafts, piers and foundations sunk by caissonYes
Hyperbaric welding in a dry atmosphere inside a submerged chamberDry repair of a submerged pipe or structureYes
Pressure leak tests of aircraft cabinsChecks carried out inside the pressurised cabinNo
Pressure tests of nuclear power plant reactor buildingsContainment tests during ten-yearly outagesNo
Where SIDON standsOur employees and operatives hold the CAH mention D. Company certification for mention D is targeted for the end of 2026. SIDON is already certified for hyperbaric works, mention A, by AIO Certification, a body accredited by Cofrac.

Tubiste, compressed-air worker, mention D operative: what do the terms mean?

The French word tubiste comes from the first compressed-air sites: workers climbed down a vertical tube, the shaft, to the working chamber of foundation caissons. Today it refers to anyone working in compressed air, in a TBM, a gallery or a caisson. Compressed-air worker, hyperbaric operative without immersion and dry hyperbaric worker all describe the same activity.

To do this work, each worker must hold a hyperbaric competence certificate (CAH) mention D, issued after training defined by the ministerial order of 12 December 2016, and be declared medically fit by the occupational physician. The certificate also states a class, which sets the maximum pressure at which they may work.

CAH classMaximum relative pressure
01,200 hPa, about 1.2 bar
I3,000 hPa, about 3 bar
II5,000 hPa, about 5 bar
IIIabove 5,000 hPa

The class is checked before the intervention: it must cover the support pressure planned for the chamber or the caisson.

A full team, never a compressed-air worker alone

The order of 22 April 2024 requires a full team for any work without immersion: at least two operatives in the hyperbaric environment, an assistant operator, a lock attendant and a hyperbaric operations supervisor, including at least one workplace first-aider. The hyperbaric prevention adviser takes part in the risk assessment and the procedures.

RolePositionTasks
Operatives (compressed-air workers)In the chamber, under pressureCarry out the task, at least two of them, and report continuously over the voice link.
Assistant operatorAt the lock and behind the bulkheadPrepares and passes tools, assists the operatives when they go in and come out.
Lock attendant (lock operator)At the lock control panelRuns compression and decompression, applies the lock procedures, triggers the rescue.
Hyperbaric operations supervisorAt the control stationDirects the intervention, checks the team, the gases and the resources, decides when to come out.

This is why we work with a full, supervised team of compressed-air workers, as a subcontractor to the tunnelling contractor or the TBM manufacturer, rather than supplying individual workers. Before any intervention, the workstation briefing sheet is signed by the hyperbaric operations supervisor, the lock attendant and the operative.

Compression, work, decompression: how an intervention runs

  • Preparation: risk assessment with the tunnelling contractor, written procedure, safety sheet, choice of tables and gases, rescue resources agreed.
  • Checks: stability of the support pressure, main and backup air supply, voice link, lighting, tools and lock checked before entry.
  • Compression: the operatives go through the man lock; the lock attendant raises the pressure to that of the chamber.
  • Work in the chamber: the duration is limited by the intervention tables and the maximum daily duration, decompression included.
  • Decompression: return through the lock with the stops of the selected table, on air or breathing oxygen.
  • Traceability: safety sheet completed, individual logbook filled in, report on the work carried out.

For work without immersion, the daily intervention time is limited to 8 h 07 up to 750 hPa and to 6 h 07 above, decompression included. The hyperbaric operations supervisor reduces it when heat, effort or the cramped chamber require it, and records this on the safety sheet.

Gases, rescue, recompression chamber: the safety rules

Work without immersion is carried out on compressed air, another breathing mixture or pure oxygen, whose use is limited to decompression and emergency procedures. Above 5,000 hPa, a mixture other than air is preferred. The employer secures the gas supply, in quality and quantity, with a backup supply.

  • Tables: the reference decompression tables are those in annex I of the order of 22 April 2024, the emergency tables those in annex II.
  • Standby recompression chamber: whether one is needed on site is decided after the risk assessment; it stays available until 12 hours after the end of the intervention.
  • Control station: it centralises communication, alarm and rescue, and records pressures and gases.
  • Evacuation: an injured or unconscious operative must be able to be brought out of the chamber, together with those helping them.
  • Fire: under pressure, compressed air makes combustion easier; combustible materials are kept to a minimum and welding is done under a hot work permit.
  • Medical follow-up: operatives receive enhanced individual monitoring by the occupational physician.

The documents to ask your contractor for

A mention D hyperbaric works company is judged on documents you can check. Ask for them at the tender stage.

  • The company certificate for hyperbaric works, mention D, valid and issued by a body accredited by Cofrac.
  • The CAH mention D of each operative, with a class suited to the planned pressure.
  • The hyperbaric safety manual, with the procedures specific to work without immersion.
  • The safety sheet for the intervention and the signed workstation briefing sheet.
  • The single risk assessment document, including the hyperbaric risk.

Our operatives hold the CAH mention D and SIDON is targeting company certification for mention D by the end of 2026: we are already preparing your tenders and your projects. The documents already available, hyperbaric certification mention A, MASE and FNTP card, are in our tender file.

Compressed-air workers in Lyon, Lille, the Paris region and across mainland France

Our teams set out with their equipment from our head office in Lyon and our branch in Seclin, near Lille. They work on tunnel and underground construction sites across mainland France: the Lyon metropolitan area and the Rhône valley, Greater Paris and the Île-de-France region, Hauts-de-France, and wherever a TBM or a caisson works under compressed air.

The same bases serve our diving work: see our pages commercial divers in Lyon, commercial divers in Paris and commercial divers in Lille, or all our areas of operation.

Frequently asked questions

What we are asked

What is a tubiste?

It is the French name for a compressed-air worker, who works without immersion in the excavation chamber of a TBM, a pressurised gallery or a caisson. They must hold the hyperbaric competence certificate (CAH) mention D.

What is the difference between mention A and mention D?

Mention A covers hyperbaric work with immersion, carried out by commercial divers. Mention D covers hyperbaric work without immersion, in compressed air. Both are reserved for certified companies.

Is SIDON certified for mention D?

Our employees and operatives hold the CAH mention D. SIDON is targeting company certification for mention D by the end of 2026, alongside its hyperbaric certification, mention A, issued by AIO Certification.

Which works fall under mention D?

Tunnel excavation with a TBM, excavation of pressurised galleries without a TBM, sinking of compressed-air caissons, hyperbaric welding in a submerged dry chamber, aircraft cabin leak tests and pressure tests of reactor buildings.

What is dry hyperbaric work?

Work at a pressure above atmospheric pressure, but out of the water: in a chamber, a lock or a caisson filled with compressed air. It differs from wet hyperbaric work, which is diving.

How long can a compressed-air intervention last?

It is limited by the intervention tables of the order of 22 April 2024 and by a maximum daily duration of 8 h 07 up to 750 hPa, and 6 h 07 above, decompression included.

Is a recompression chamber needed on site?

This is decided after the risk assessment, with the hyperbaric prevention adviser and the local emergency services. If one is planned, it stays available until 12 hours after the end of the intervention.

Can you supply compressed-air workers?

We work with a full, supervised team: at least two operatives, an assistant operator, a lock attendant and a hyperbaric operations supervisor, as required by the order of 22 April 2024.

Which CAH class for which pressure?

Class 0 up to 1,200 hPa, class I up to 3,000 hPa, class II up to 5,000 hPa, class III above. The operatives' class must cover the planned support pressure.

Do you work on microtunnelling machines?

Yes, when the machine is designed to give an operative access to the chamber and has a suitable lock. The cramped space requires specific preparation, often with workshop trials.

A structure in contact with water? Call us.