# Underground works: tunnels, galleries and caissons

> TBM tunnels, galleries, shafts and caissons under compressed air: CAH mention D compressed-air workers, rope access technicians and divers for underground structures.

[Home](https://www.sidon-construction.fr/en) / [Sectors](https://www.sidon-construction.fr/en/sectors) / Underground

Sector

Under a river, below the water table or beneath the city: we work in tunnels under construction, galleries and structures under compressed air, with operatives holding the CAH mention D.

[Describe my structure](https://www.sidon-construction.fr/en/contact) · [Call +33 4 82 83 84 44](tel:+33482838444)

A tunnel dug below the water table is still a structure in contact with water: it is the air pressure that keeps the water out. Our underground works are aimed at tunnelling contractors, TBM manufacturers, project engineers and network operators: metro, rail, road, sewerage, utility galleries and energy networks.

Under pressure, our compressed-air workers carry out [hyperbaric work without immersion](https://www.sidon-construction.fr/en/compressed-air-hyperbaric-work): they hold the CAH mention D, and SIDON is targeting company certification for mention D by the end of 2026. A typical intervention is described on the page [interventions in TBM excavation chambers](https://www.sidon-construction.fr/en/tbm-cutterhead-hyperbaric-intervention).

At atmospheric pressure, the same structures call on our other trades: rope access technicians in shafts, [confined space work](https://www.sidon-construction.fr/en/confined-space-work) in galleries, commercial divers and [ROV](https://www.sidon-construction.fr/en/rov-inspection) in flooded shafts and galleries.

## In brief

- TBM tunnels: excavation chamber, cutterhead, locks
- Pressurised galleries dug without a TBM
- Shafts and caissons sunk under compressed air
- Hyperbaric welding in a submerged dry chamber
- Operatives holding the CAH mention D; company certification targeted end 2026

## TBM tunnels: *metro, rail, road, sewerage*

Pressurised-face tunnel boring machines dig most urban tunnels and river crossings: metro lines, rail and road tunnels, sewer mains, network galleries. At each maintenance stop, the excavation chamber may have to stay under pressure.

Our compressed-air workers change the cutting tools, inspect and repair the cutterhead and clear a clogged chamber. The intervention is prepared with tunnel site management, who set the support pressure, the machine stoppage and the shifts: see the [interventions in TBM excavation chambers](https://www.sidon-construction.fr/en/tbm-cutterhead-hyperbaric-intervention).

## Pressurised galleries *without a TBM*

A short gallery, a cross-passage, a connection between structures or a repair in water-bearing ground can be excavated under compressed air, without a TBM. The air pressure limits water ingress at the face while the support is installed.

These works also fall under mention D: the same compression and decompression rules, the same full team, the same rescue requirements, with particular attention to ventilation, lighting and the evacuation of an injured person.

## Shafts and caissons *sunk under compressed air*

The compressed-air caisson is the oldest method of working under pressure. A caisson open at the bottom, edged with a cutting edge, sinks into the ground as the soil is excavated beneath it; compressed air drives the water out of the working chamber. Operatives reach it through a shaft fitted with a lock.

The method is used to sink shafts, piers and foundations below the water table or in a riverbed. Caisson disease, now called decompression sickness, first appeared on these 19th-century sites: decompression is now carried out according to the tables of the order of 22 April 2024.

## Hyperbaric welding *in a submerged dry chamber*

To weld a submerged pipe or structure with the quality of dry welding, a chamber is placed underwater around the area to be repaired, then emptied with compressed air. The welder works dry inside, at the pressure of the surrounding water.

This type of project combines our two mentions: our mention A commercial divers place and secure the chamber underwater, our mention D operatives work dry inside it. For repairs in open water, see our [underwater welding and cutting](https://www.sidon-construction.fr/en/underwater-welding-and-cutting).

## Underground structures: *what needs preparing*

| Structure | Intervention | What needs preparing |
| --- | --- | --- |
| TBM tunnel | Excavation chamber, cutterhead, cutting tools | Support pressure, machine stoppage, locks, co-activity with the TBM crew |
| Pressurised gallery | Face, temporary support, connection | Pressure stability, ventilation, lighting, evacuation of an injured person |
| Sunk shaft or caisson | Working chamber, cutting edge, access shaft | Pressure, locks, removal of spoil, rescue |
| Submerged dry chamber | Dry welding on a pipe or structure | Placement underwater, gas supply, fire prevention |
| Gallery or shaft at atmospheric pressure | Inspection, works, difficult access | Atmosphere testing, lockouts, outside watch |

In every case, the intervention starts with qualifying the need and a joint risk assessment with the main contractor: prevention plan, procedures, rescue resources and the nearest hyperbaric medicine centre.

## Shafts, galleries, flooded structures: *our other trades underground*

- **Rope access technicians**: descent and work in shafts, chimneys and on walls, with our [work at height and difficult access](https://www.sidon-construction.fr/en/rope-access-and-work-at-height) teams.
- **Confined spaces**: utility galleries, manholes and buried tanks, with atmosphere testing and an outside watch: see [confined space work](https://www.sidon-construction.fr/en/confined-space-work).
- **Flooded structures**: shafts, galleries and pipes under water inspected by our mention A commercial divers or by [ROV inspection](https://www.sidon-construction.fr/en/rov-inspection).

Our teams set out from Lyon and from Seclin, near Lille, and work on underground sites across mainland France, from Greater Paris to the Lyon metropolitan area.

A structure that needs work?

Describe it in a few lines: a technical manager will call you back to define the need and price the job.

[Describe my structure](https://www.sidon-construction.fr/en/contact) · [+33 4 82 83 84 44](tel:+33482838444)

Frequently asked questions

## What we are asked

### What is compressed-air work?

Work carried out in an enclosure where the air is kept above atmospheric pressure to hold back water and ground: a TBM chamber, a pressurised gallery or a caisson. It falls under mention D.

### Which underground structures require hyperbaric work?

Tunnels dug by TBM below the water table or under a river, pressurised galleries, shafts and caissons sunk under compressed air, and submerged dry chambers.

### What is a compressed-air caisson?

An enclosure open at the bottom, sunk into the ground or placed underwater, from which compressed air drives out the water: operatives work dry inside, under pressure, and enter through a lock.

### Do you work on tunnel projects in the Paris region?

Yes. Our teams set out from Lyon and Seclin and work across mainland France, including on Greater Paris projects.

### Can you work in a flooded gallery?

Yes, by diving: our mention A commercial divers work in shafts, galleries and pipes under water. When access is impossible, an ROV inspection gives a first view.

### Does a sewer gallery fall under mention D?

Only if it is kept under pressure. At atmospheric pressure, it falls under confined space rules: atmosphere testing, ventilation, watch and rescue.

### Is SIDON certified for mention D?

Our employees and operatives hold the CAH mention D. SIDON is targeting company certification for mention D by the end of 2026; it is already certified for hyperbaric works, mention A, and MASE.

Related pages

## Our trades for underground structures

[Hyperbaric work without immersion](https://www.sidon-construction.fr/en/compressed-air-hyperbaric-work) — Trade CAH mention D compressed-air workers, full team, gases and rescue.

[Excavation chamber interventions](https://www.sidon-construction.fr/en/tbm-cutterhead-hyperbaric-intervention) — Service Cutting tools, cutterhead, welding and locks.

[Confined space work](https://www.sidon-construction.fr/en/confined-space-work) — Difficult access Galleries, shafts and tanks at atmospheric pressure.

[ROV inspection](https://www.sidon-construction.fr/en/rov-inspection) — Inspection Flooded structures, pipes and galleries where diving is not possible.

---

URL: https://www.sidon-construction.fr/en/underground-works
Versions: [fr](https://www.sidon-construction.fr/travaux-souterrains) · [en](https://www.sidon-construction.fr/en/underground-works) · [ru](https://www.sidon-construction.fr/ru/underground-works) · [es](https://www.sidon-construction.fr/es/obras-subterraneas) · [it](https://www.sidon-construction.fr/it/lavori-in-sotterraneo) · [de](https://www.sidon-construction.fr/de/untertagebau) · [zh-Hans](https://www.sidon-construction.fr/zh/underground-works) · [ar](https://www.sidon-construction.fr/ar/underground-works)
SIDON Construction · +33 4 82 83 84 44 · contact@sidon-construction.fr · [Underwater works quote and contact](https://www.sidon-construction.fr/en/contact)
