# Interventions in the excavation chamber of a TBM

> CAH mention D compressed-air workers in TBM excavation chambers: disc cutter and cutting tool changes, cutterhead inspection and welding, man locks.

[Home](https://www.sidon-construction.fr/en) / [Expertise](https://www.sidon-construction.fr/en/expertise) / [Compressed-air hyperbaric work](https://www.sidon-construction.fr/en/compressed-air-hyperbaric-work) / Interventions in TBM excavation chambers

Compressed-air hyperbaric work

Worn disc cutters, clogged cutterhead, abnormal torque: when the ground rules out opening the chamber at atmospheric pressure, our compressed-air workers enter it under pressure, through the man lock.

[Describe my structure](https://www.sidon-construction.fr/en/contact) · [Call +33 4 82 83 84 44](tel:+33482838444)

The excavation chamber is the space between the cutterhead and the pressure bulkhead of the tunnel boring machine. In water-bearing ground, it stays under pressure during excavation to support the tunnel face and keep the water out. When work has to be done inside, the pressure is maintained with compressed air and the operatives enter through a lock.

These hyperbaric interventions fall under mention D. Our employees and operatives hold the hyperbaric competence certificate (CAH) mention D, and SIDON is targeting company certification for mention D by the end of 2026. The full organisation, team, gases and rescue, is described on the page [hyperbaric work without immersion](https://www.sidon-construction.fr/en/compressed-air-hyperbaric-work).

We work as a subcontractor to the tunnelling contractor or the machine manufacturer, with a full team: operatives, assistant operator, lock attendant and hyperbaric operations supervisor. The intervention is prepared with the TBM pilot and site management, who set the support pressure and the machine stoppage.

## In brief

- **Operations**: cutting tools, inspection, welding, clearing
- **Machines**: EPB, slurry, accessible microtunnelling machine
- **Access**: man lock and material lock
- **Team**: at least 2 operatives, assistant, lock attendant, supervisor
- **Operatives**: CAH mention D holders
- **Deliverables**: wear readings, photos, safety sheet

## Why intervene *in compressed air*?

The machine often signals the need: a drop in advance rate, abnormal cutterhead torque, vibrations, wear detected by sensors, rising thrust. In clay, clogging of the cutterhead and the chamber slows excavation. The cutterhead then has to be seen, measured and repaired.

When the ground is stable and dry, the intervention can be done at atmospheric pressure, after checks. Below the water table, under a river or in loose soil, opening the chamber without pressure would risk water ingress or a collapse of the face. The pressure is then kept and, in the upper part of the chamber, replaced by compressed air: this is a hyperbaric intervention.

**A test before entry** · Before any compression, the stability of the working pressure is checked: methods, resources and tests are defined in advance, as required by the order of 22 April 2024, to avoid a pressure drop during the intervention.

## Operations *in the excavation chamber*

- **Changing cutting tools**: disc cutters, scrapers, buckets, teeth and gauge cutters, removed and replaced after recording their wear.
- **Cutterhead inspection under pressure**: condition of the structure, tool holders and wear protection, readings and photos for tunnel site management.
- **Welding and hardfacing**: hyperbaric welding and cutting to repair the cutting head or hardface worn areas, under a hot work permit.
- **Clearing and cleaning**: clogged clay, blocks and deposits removed from the cutterhead and the chamber so the machine can advance again.
- **Chamber mechanics**: injection nozzles, pressure sensors, suction screens or crusher, depending on the machine type.

Tools and parts go through the material lock. The number of tools changed per intervention depends on the pressure, the permitted duration and accessibility: it is agreed with tunnel site management before compression.

## EPB, slurry, microtunnelling: *what changes*

| Machine | How the pressure is held | For the intervention |
| --- | --- | --- |
| Earth pressure balance (EPB) TBM | The chamber is filled with excavated, conditioned soil, and the pressure is regulated by extraction through the screw conveyor. | The soil level in the chamber is lowered and replaced by compressed air, after a stability test. |
| Slurry TBM | The chamber is filled with bentonite slurry, whose pressure supports the face. | The slurry level is lowered and replaced by air; the bentonite filter cake on the face limits air losses. |
| Microtunnelling machine | Same principle, on a small diameter, piloted from the surface. | Only possible if the machine provides access and a lock for the operative; specific preparation and trials. |

In every case, the working pressure is set by tunnel site management according to the ground and the water table. It determines the CAH class required of the operatives, the decompression tables and the possible time in the chamber.

## Man lock, material lock: *the role of the lock attendant*

The man lock connects the back of the TBM, at atmospheric pressure, with the pressurised chamber. Usually made of two compartments, it allows one team to be compressed while the other works or decompresses. Its safety requirements are set by standard EN 12110.

The lock attendant, also called lock operator, runs the chambers and locks: raises and lowers the pressure, applies the decompression stops, monitors the operatives and triggers the rescue procedure. Before working on a given lock, they receive the instructions specific to that lock, and the employer checks their competence to operate it.

- **At the control panel**: pressures, breathing gases and decompression oxygen, recorded throughout the intervention.
- **On the voice link**: constant communication between the lock attendant, the operatives and the hyperbaric operations supervisor.
- **In an accident**: evacuation of the operative through the lock, oxygen therapy and standby recompression on medical advice.

## Preparing the intervention: *useful information*

To price and prepare an excavation chamber intervention, send us at the tender stage:

- **The machine**: type, diameter, access to the chamber, man lock and material lock.
- **The pressure**: planned support pressure, ground and water table at the stoppage point.
- **The work**: number and type of tools to change, expected repairs or inspections.
- **The schedule**: machine stoppage date, planned duration, shift work.
- **Site resources**: lifting in the chamber, compressed air, recompression chamber, access for emergency services.
- **Safety**: prevention plan, co-activity, hot work permit, nearest hyperbaric medicine centre.

A technical manager calls you back to qualify the need and agree the method with tunnel site management.

A structure that needs work?

Describe it in a few lines: a technical manager will call you back to define the need and price the job.

[Describe my structure](https://www.sidon-construction.fr/en/contact) · [+33 4 82 83 84 44](tel:+33482838444)

Frequently asked questions

## What we are asked

### What is the excavation chamber of a TBM?

It is the space between the cutterhead and the pressure bulkhead of the machine. In water-bearing ground, it stays under pressure to support the tunnel face.

### When is a hyperbaric intervention needed rather than one at atmospheric pressure?

When the ground or the water table do not allow the chamber to be opened without pressure: under a river, below the water table or in loose soil. The working pressure is set by tunnel site management.

### How long does an excavation chamber intervention last?

It depends on the pressure and on the tables of the order of 22 April 2024. The daily duration is limited to 8 h 07 up to 750 hPa and to 6 h 07 above, decompression included.

### How many people does an excavation chamber intervention need?

At least two operatives under pressure, an assistant operator, a lock attendant and a hyperbaric operations supervisor, including at least one workplace first-aider.

### Can welding be done in the chamber under compressed air?

Yes, under a hot work permit and with suitable measures: under pressure, compressed air makes combustion easier, so combustible materials are kept to a minimum and extinguishing means are provided.

### Do you work on microtunnelling machines?

Yes, when the machine allows an operative to reach the chamber and has a suitable lock. The cramped space requires specific preparation and tools.

### Who provides the lock and the recompression chamber?

The lock is part of the TBM. Whether a standby recompression chamber is needed is decided after the risk assessment; resources are agreed with the tunnelling contractor before the works.

### Is SIDON certified for these interventions?

Our employees and operatives hold the CAH mention D. SIDON is targeting company certification for mention D by the end of 2026; it is already certified for hyperbaric works, mention A, and MASE.

Related services

## Other pages: hyperbaric work without immersion

[Underground works](https://www.sidon-construction.fr/en/underground-works) — Sector Tunnels, galleries, shafts and caissons under compressed air.

[Underwater welding and cutting](https://www.sidon-construction.fr/en/underwater-welding-and-cutting) — Underwater Arc welding and oxy-cutting by our mention A commercial divers.

[Confined space work](https://www.sidon-construction.fr/en/confined-space-work) — Difficult access Tanks, shafts and galleries: atmosphere testing, watch and rescue.

[Hyperbaric work without immersion](https://www.sidon-construction.fr/en/compressed-air-hyperbaric-work) — Trade All our services, our team and our rules for this trade.

---

URL: https://www.sidon-construction.fr/en/tbm-cutterhead-hyperbaric-intervention
Versions: [fr](https://www.sidon-construction.fr/intervention-chambre-attaque-tunnelier) · [en](https://www.sidon-construction.fr/en/tbm-cutterhead-hyperbaric-intervention) · [ru](https://www.sidon-construction.fr/ru/tbm-cutterhead-hyperbaric-intervention) · [es](https://www.sidon-construction.fr/es/intervencion-hiperbarica-camara-tuneladora) · [it](https://www.sidon-construction.fr/it/intervento-iperbarico-camera-di-scavo-tbm) · [de](https://www.sidon-construction.fr/de/drucklufteinsatz-abbaukammer-tbm) · [zh-Hans](https://www.sidon-construction.fr/zh/tbm-cutterhead-hyperbaric-intervention) · [ar](https://www.sidon-construction.fr/ar/tbm-cutterhead-hyperbaric-intervention)
SIDON Construction · +33 4 82 83 84 44 · contact@sidon-construction.fr · [Underwater works quote and contact](https://www.sidon-construction.fr/en/contact)