# Removal of four sailboat wrecks in Chingoudy Bay

> In Chingoudy Bay in Hendaye, SIDON removed four sailboats abandoned at their moorings and handed them over to an approved boat demolition scheme.

[Home](https://www.sidon-construction.fr/en) / [Projects](https://www.sidon-construction.fr/en/projects) / Hendaye (64)

Hendaye (64)

In Chingoudy Bay in Hendaye, SIDON removed four sailboats abandoned at their moorings and handed them over to an approved boat demolition scheme.

**4 sailboats** · removed from the bay

**3 days** · from 18 to 20 November 2026

**Approved scheme** · for boat demolition

## Background

In Chingoudy Bay, in Hendaye, four sailboats had been abandoned at their moorings. Working for a French State service, SIDON was asked to take them out of the water and have them demolished through an approved scheme.

## Bringing the boats into the harbour

On 18 November, the four sailboats were brought into Hendaye harbour. Two of them were emptied of their waste and left afloat at the pontoon until they could be lifted. The other two were lifted by crane the same day and set on cradles in the technical area, to rule out any weather risk before loading.

## Emptying and unstepping the masts

The waste left on board the four boats was gathered on the quay, then taken to an approved treatment centre in Anglet: 120 kg of non-hazardous waste, with a weighbridge ticket. On 19 November, the masts of all four sailboats were unstepped.

## Lifting and transport

Each sailboat was loaded onto the trailer of a specialist haulier, as an oversize load, bound for an approved demolition centre in Mérignac, Gironde. The first was lifted with the marina's boat hoist on 19 November; the last boat still afloat was lifted on the morning of the 20th.

## Why an approved scheme

An end-of-life pleasure boat is demolished in an approved centre, where materials are sorted and hazardous waste is treated separately. Left at its mooring, a wreck deteriorates, gets in the way of other water users and eventually sinks with everything it contains.

## Outcome

By 20 November, the four sailboats had left Chingoudy Bay: the mooring area is clear and the wrecks are going through the demolition scheme.

## Project facts

- **Location**: Chingoudy Bay, Hendaye harbour, Pyrénées-Atlantiques (64)
- **Structure**: four sailboats abandoned at their moorings
- **Type of work**: wreck removal and demolition through an approved scheme
- **Techniques**: towing, crane and boat hoist lifting, mast unstepping, oversize road transport
- **Team**: four SIDON commercial divers

**Related expertise** · [Refloating sunken boats and wrecks](https://www.sidon-construction.fr/en/wreck-refloating) · [Wreck demolition and refloating](https://www.sidon-construction.fr/en/demolition-and-salvage) · [Marine equipment and work from the water](https://www.sidon-construction.fr/en/marine-equipment) · [Underwater works, commercial divers in Bayonne (64)](https://www.sidon-construction.fr/en/commercial-divers-bayonne-pau)

Projects

## Other projects

[Installation of staff gauges at the Dorlay dam](https://www.sidon-construction.fr/en/projects/staff-gauges-dorlay-dam) — La Terrasse-sur-Dorlay (42) 20 m deep 6 °C water Two staff gauges and their elevation plates installed at more than 20 m on the dam face, in water at 6 °C, by touch. Read the case study

[Restoration of two masonry bridges on the Grand Morin](https://www.sidon-construction.fr/en/projects/masonry-bridge-restoration-coulommiers) — Coulommiers (77) 250 m² repointed 5 wks on site Two masonry bridges on the Grand Morin: four big-bag cofferdams, 250 m² of repointing and low-pressure grout injection. Read the case study

[Refloating a sailing boat in a Natura 2000 area](https://www.sidon-construction.fr/en/projects/sailboat-refloating-natura-2000-hendaye) — Hendaye (64) 1 year aground Natura 2000 protected site Sailing boat aground for nearly a year on the Île aux Oiseaux: refloated with lift bags, then demolished, with materials sorted through a recycling route. Read the case study

---

URL: https://www.sidon-construction.fr/en/projects/wreck-removal-chingoudy-bay-hendaye
Versions: [fr](https://www.sidon-construction.fr/realisations/enlevement-epaves-baie-chingoudy-hendaye) · [en](https://www.sidon-construction.fr/en/projects/wreck-removal-chingoudy-bay-hendaye) · [ru](https://www.sidon-construction.fr/ru/projects/wreck-removal-chingoudy-bay-hendaye) · [es](https://www.sidon-construction.fr/es/obras/retirada-pecios-bahia-txingudi-hendaya) · [it](https://www.sidon-construction.fr/it/lavori/rimozione-relitti-baia-chingoudy-hendaye)
SIDON Construction · +33 4 82 83 84 44 · contact@sidon-construction.fr · [Underwater works quote and contact](https://www.sidon-construction.fr/en/contact)