Removal of four sailboat wrecks in Chingoudy Bay

In Chingoudy Bay in Hendaye, SIDON removed four sailboats abandoned at their moorings and handed them over to an approved boat demolition scheme.

4 sailboatsremoved from the bay
3 daysfrom 18 to 20 November 2026
Approved schemefor boat demolition

Background

In Chingoudy Bay, in Hendaye, four sailboats had been abandoned at their moorings. Working for a French State service, SIDON was asked to take them out of the water and have them demolished through an approved scheme.

Bringing the boats into the harbour

On 18 November, the four sailboats were brought into Hendaye harbour. Two of them were emptied of their waste and left afloat at the pontoon until they could be lifted. The other two were lifted by crane the same day and set on cradles in the technical area, to rule out any weather risk before loading.

Emptying and unstepping the masts

The waste left on board the four boats was gathered on the quay, then taken to an approved treatment centre in Anglet: 120 kg of non-hazardous waste, with a weighbridge ticket. On 19 November, the masts of all four sailboats were unstepped.

Lifting and transport

Each sailboat was loaded onto the trailer of a specialist haulier, as an oversize load, bound for an approved demolition centre in Mérignac, Gironde. The first was lifted with the marina's boat hoist on 19 November; the last boat still afloat was lifted on the morning of the 20th.

Why an approved scheme

An end-of-life pleasure boat is demolished in an approved centre, where materials are sorted and hazardous waste is treated separately. Left at its mooring, a wreck deteriorates, gets in the way of other water users and eventually sinks with everything it contains.

Outcome

By 20 November, the four sailboats had left Chingoudy Bay: the mooring area is clear and the wrecks are going through the demolition scheme.

In the field

Photos from our sites

Photos taken on our job sites.

Sailboat set on a cradle in the technical area of Hendaye harbour
Two sailboats emptied of their waste, afloat at the pontoon in Hendaye harbour
Sailboat lifted by crane and set on a cradle
Sailboat lifted with the boat hoist of Hendaye marina
Waste removed from the sailboats, loaded on a trailer for disposal