# Inspection and replacement of the mooring area buoys in Hendaye

> In Chingoudy Bay, SIDON inspected and marked the seven buoys of the Hendaye mooring area, put two buoys back in place and installed a new mooring line.

[Home](https://www.sidon-construction.fr/en) / [Projects](https://www.sidon-construction.fr/en/projects) / Hendaye (64)

Hendaye (64)

In Chingoudy Bay, SIDON inspected and marked the seven buoys of the Hendaye mooring area, put two buoys back in place and installed a new mooring line.

**7 buoys** · inspected and marked

**2 buoys** · put back in place

**1 line** · new mooring line

## Background

The light-equipment mooring area (ZMEL) of Hendaye, in Chingoudy Bay, is marked out by zone buoys. Working for a French State service, SIDON inspected these buoys, put back the two that had been removed and updated their markings.

## Putting two buoys back in place

Buoys A and C were collected on 18 November and put back at their positions. Buoy C was given a new mooring line: galvanised chain, new swivel and shackles, all moused. Buoy A was set back on its original sinker, with its existing rope, which was in good condition.

## Marking and righting

The seven zone buoys, A, B, C, D, E, H and I, were marked with their letter and the identification of their operator. Ballast was added to all the buoys to make them float upright.

## Buoy-by-buoy condition

Each buoy was recorded with its GPS position and condition. Six are in sound condition; buoy I, worn, is flagged for monitoring in the file handed over at the end of the works.

## Long-term follow-up

SIDON knows these moorings: in March 2024, our divers had already installed the lines of buoys D, H and I. The as-built file records how these lines are made up, which prepares future inspections.

## Outcome

On 21 November 2026, the seven buoys of the mooring area were in place, marked and ballasted, at their positions.

## Project facts

- **Location**: Chingoudy Bay, Hendaye, Pyrénées-Atlantiques (64)
- **Structure**: zone buoys of the mooring area (ZMEL)
- **Type of work**: inspection, replacement and marking of buoys
- **Techniques**: work from the boat, galvanised chain mooring line, ballasting, GPS survey
- **Team**: four SIDON commercial divers

**Related expertise** · [Water safety cover and work site buoyage](https://www.sidon-construction.fr/en/marine-safety-and-buoyage) · [Marine and port works, quay inspection](https://www.sidon-construction.fr/en/marine-and-port-works) · [Marine equipment and work from the water](https://www.sidon-construction.fr/en/marine-equipment) · [Underwater works, commercial divers in Bayonne (64)](https://www.sidon-construction.fr/en/commercial-divers-bayonne-pau)

Projects

## Other projects

[Installation of staff gauges at the Dorlay dam](https://www.sidon-construction.fr/en/projects/staff-gauges-dorlay-dam) — La Terrasse-sur-Dorlay (42) 20 m deep 6 °C water Two staff gauges and their elevation plates installed at more than 20 m on the dam face, in water at 6 °C, by touch. Read the case study

[Restoration of two masonry bridges on the Grand Morin](https://www.sidon-construction.fr/en/projects/masonry-bridge-restoration-coulommiers) — Coulommiers (77) 250 m² repointed 5 wks on site Two masonry bridges on the Grand Morin: four big-bag cofferdams, 250 m² of repointing and low-pressure grout injection. Read the case study

[Refloating a sailing boat in a Natura 2000 area](https://www.sidon-construction.fr/en/projects/sailboat-refloating-natura-2000-hendaye) — Hendaye (64) 1 year aground Natura 2000 protected site Sailing boat aground for nearly a year on the Île aux Oiseaux: refloated with lift bags, then demolished, with materials sorted through a recycling route. Read the case study

---

URL: https://www.sidon-construction.fr/en/projects/mooring-buoys-zmel-hendaye
Versions: [fr](https://www.sidon-construction.fr/realisations/controle-bouees-zmel-hendaye) · [en](https://www.sidon-construction.fr/en/projects/mooring-buoys-zmel-hendaye) · [ru](https://www.sidon-construction.fr/ru/projects/mooring-buoys-zmel-hendaye) · [es](https://www.sidon-construction.fr/es/obras/boyas-fondeo-zmel-hendaya) · [it](https://www.sidon-construction.fr/it/lavori/boe-ormeggio-zmel-hendaye)
SIDON Construction · +33 4 82 83 84 44 · contact@sidon-construction.fr · [Underwater works quote and contact](https://www.sidon-construction.fr/en/contact)