Hendaye (64)
Inspection and replacement of the mooring area buoys in Hendaye
In Chingoudy Bay, SIDON inspected and marked the seven buoys of the Hendaye mooring area, put two buoys back in place and installed a new mooring line.
Background
The light-equipment mooring area (ZMEL) of Hendaye, in Chingoudy Bay, is marked out by zone buoys. Working for a French State service, SIDON inspected these buoys, put back the two that had been removed and updated their markings.
Putting two buoys back in place
Buoys A and C were collected on 18 November and put back at their positions. Buoy C was given a new mooring line: galvanised chain, new swivel and shackles, all moused. Buoy A was set back on its original sinker, with its existing rope, which was in good condition.
Marking and righting
The seven zone buoys, A, B, C, D, E, H and I, were marked with their letter and the identification of their operator. Ballast was added to all the buoys to make them float upright.
Buoy-by-buoy condition
Each buoy was recorded with its GPS position and condition. Six are in sound condition; buoy I, worn, is flagged for monitoring in the file handed over at the end of the works.
Long-term follow-up
SIDON knows these moorings: in March 2024, our divers had already installed the lines of buoys D, H and I. The as-built file records how these lines are made up, which prepares future inspections.
Outcome
On 21 November 2026, the seven buoys of the mooring area were in place, marked and ballasted, at their positions.
Other projects
La Terrasse-sur-Dorlay (42)Installation of staff gauges at the Dorlay dam
Two staff gauges and their elevation plates installed at more than 20 m on the dam face, in water at 6 °C, by touch.
Read the case study
Coulommiers (77)Restoration of two masonry bridges on the Grand Morin
Two masonry bridges on the Grand Morin: four big-bag cofferdams, 250 m² of repointing and low-pressure grout injection.
Read the case study
Hendaye (64)Refloating a sailing boat in a Natura 2000 area
Sailing boat aground for nearly a year on the Île aux Oiseaux: refloated with lift bags, then demolished, with materials sorted through a recycling route.
Read the case studyPhotos from our sites
Photos taken on our job sites.





A structure in contact with water? Call us.
Describe it in a few lines: a technical manager will call you back to define the need and price the job.